RCM is seeking a Senior C&Q Engineer to lead the investigation, correction, and qualification of a redundant rooftop air handling unit (AHU) that supports six production AHUs serving Grade C and Grade D classified space. During an automatic failover event, only three of the unit's four supply fans ran. You will find out why, support the fix, document the failover sequence, and qualify the unit for GMP use.
You will be RCM's dedicated on-site lead, working directly with the client's System Engineer, Quality Assurance, Facilities, and vendors with executive oversight from RCM leadership.
β Responsibilities
β Root cause investigation: Lead the investigation of the fan failure across fan and VFD hardware, power and wiring, fan status proofing, and Metasys start and fan-staging logic. Pull and analyze Metasys alarm and trend history and PI Historian data (fan commands and status, VFD speed and faults, damper positions, airflow, room differential pressure).
β Corrective action and verification: Define the corrective change request and test plan; witness repairs and program changes performed by the client, JCI, or Daikin, and verify them with post-change functional checks.
β Drawings and documentation: Field-verify and redline AHU-M mechanical, ATC, and electrical drawings; document the sequence of operations, point list, and alarm set points, including automatic failover.
β IOV protocol: Revise and execute IOV protocol D-125853 (v2.0), adding automatic failover test cases for each of six production AHUs alongside maintenance-mode tests.
β IOV execution: Execute installation and operational verification (drawing walkdowns, wiring and VFD checks, instrument calibration, alarm and interlock tests, loss-of-fan and VFD fault tests, failover simulations) in approved production windows with live differential pressure trending, defined abort criteria, and immediate return of production AHUs if needed.
β Non-conformances and procedures: Manage non-conformances per site procedures and support deviation and CAPA close-out; draft AHU-M sections of the AHU operating procedure (D-11507) and build the requirements traceability matrix to the URS.
β Reports, turnover, and performance verification: Compile the IOV summary report and engineering turnoβ¦