Construction Safety Manager- Data Center Construction

Strategic Direct Solutions, LLC ยท Santa Teresa, NM
Work typeContract
Pay$35 โ€“ $45/hr
PostedNov 15, 2026
LevelSenior
In short Project Duration: This is a temporary, project-based position with an anticipated duration of at least 12 months.
R

๐Ÿ“‹ About the job

Job typeFull-Time / Temporary Contract (Long-Term Project)

Job Description

Job Description

Project Duration: This is a temporary, project-based position with an anticipated duration of at least 12 months. Depending on project timelines, workload, and client needs, assignments may be extended for an additional 1โ€“2 years, with the potential for projects to span 2โ€“3 years total.

Job Overview

Strategic Direct Solutions (SDS) is seeking experienced Construction Safety Managers to support multiple large-scale data center construction projects across the United States. This position will be responsible for overseeing daily jobsite safety operations, ensuring compliance with OSHA regulations, implementing safety procedures, and promoting a safe working environment for all personnel.

Ideal candidates will have a strong background in commercial or industrial construction safety, preferably within data centers, electrical infrastructure, or large-scale construction projects.

Key Responsibilities

  • Oversee and enforce all jobsite safety policies, procedures, and OSHA regulations.
  • Conduct daily safety inspections, site walkthroughs, and hazard assessments.
  • Lead daily toolbox talks, safety meetings, and new-hire safety orientations.
  • Monitor construction activities involving electrical installations, overhead infrastructure, material handling, aerial lifts, and power distribution systems.
  • Identify potential safety hazards and implement corrective actions to prevent incidents.
  • Ensure proper use of PPE, fall protection, and safe work practices.
  • Review Job Hazard Analyses (JHAs), Job Safety Analyses (JSAs), and other required safety documentation.
  • Investigate workplace incidents, near misses, and safety concerns, providing detailed reports and corrective action recommendations.
  • Maintain accurate safety records, inspection reports, and compliance documentation.
  • Coordinate with project managers, site supervisors, subcontractors, and client safety representatives to maintain a safe and compliant work environment.
  • Monitor compliance with Lockout/Tagout (LOTO), electrical safety, ladder safety, and equipment operation procedures.

Qualifications & Requirements

  • Previous experience in construction safety management or site safety supervision.
  • Experience working on large-scale commercial, industrial, electrical, or data center construction projects preferred.
  • Strong knowledge of OSHA construction standards (29 CFR 1926).
  • OSHA 30 Construโ€ฆ
๐Ÿ“„ Read the full description โ†’ The rest of this listing is on the hiring partnerโ€™s site.
Interested in this role?Apply in one click โ€” no JobQ account needed.
Apply now โ†’
Construction Safety Manager- Data Center Constru...Strategic Direct Solutions, LLC
Apply now